
Quote for Isla Fernandes ยท 6 November 2026
Raised Deck and Stairs
12 Barnhill Road, Terrigal NSW
Total including GST
$21,593
5.0from 43 Google reviews
Hi Isla, great to meet you and see that view from the back of the house. The old pine deck has rot in the bearers, so we'll take it all out and build a new spotted gum deck on a galvanised steel frame that will last. I've quoted new stairs down to the yard with a handrail on both sides.
CallumSpotted Gum Carpentry ยท 0491 570 156
This is where your personal message to the customer goes. You write it for each quote, or start from one you've saved.
Your quote
What's included
New deck ยท Stairs ยท Spotted gum ยท Raised (over 1m)
These are your line items. You pick them from your own list for each job, with your wording, what's included and your prices. Add, change or remove as many as you like.
Deck
$14,480 + GSTRemove old deck
$1,600The old pine deck, frame and stairs taken down and taken away.
New deck
$12,88028 mยฒ at $460 per mยฒ
A new spotted gum deck on a galvanised steel subframe, built to last in the salt air.
- Concrete footings and steel posts
- Galvanised steel bearers and joists
- 140mm spotted gum boards with hidden fixings
- Two coats of decking oil
- Engineering for the raised frame
Stairs
$4,200 + GSTStairs and handrails
$4,200A new flight of stairs from the deck down to the yard, built to code.
- Galvanised stringers
- Spotted gum treads with anti-slip nosing
- Handrails on both sides
- Stainless balusters to match the deck
Add to your job
Tick any you'd like. The total updates as you go.
Optional extras your customer can tick. You choose what to offer on each quote.
Extra prices include GST.
- Price before GST
- $19,630
- GST
- $1,963
A deposit of $500 secures your booking when you accept. The rest is due when the work is done.
This quote is valid until 31 January 2027.
The totals, GST and deposit are worked out for you. You set your deposit and how long quotes are valid in settings.
Why choose us
Why customers pick Spotted Gum Carpentry
- โ Insured ยท $20 million public liability
- โ ABN registered
5.0โ
Google rating
43
Google reviews
Frames that last
Galvanised steel subframes that won't rot, sag or get eaten by termites.
Built to code
Stairs, handrails and balustrades built to the building code, with engineering where needed.
Real hardwood
Australian spotted gum and merbau, picked board by board.
Fully insured
Public liability insurance and a licensed carpenter on every job.
About us
Who you'll be dealing with
G'day, I'm Callum. Spotted Gum Carpentry is a small local team of carpenters, and you deal with me from the quote right through to the final clean-up. We take pride in turning up when we say we will, keeping you in the loop, and leaving every job better than we found it.
Add a photo of you or your team, if you have one, and a few words about you. Leave it out and this part just doesn't show.
How we work
What you get when you go with us
Here's exactly how your job runs, from yes to finished.
- 1
Accept online
Tick any extras and accept. Your deposit orders the timber and steel.
- 2
Out with the old
Old deck removed and footings dug and poured.
- 3
Frame
Steel posts, bearers and joists set level and checked.
- 4
Boards and stairs
Decking laid, stairs and handrails built.
- 5
Oil and handover
Two coats of oil and a walk-through with care tips.
You can customise these sections in your settings.
Our previous work
See the difference
Before and after, from jobs we've done.
This is where your own before and after photos go, or plain photos of finished jobs. You add them once in set-up and they show on every quote.
Before
AfterReviews
What customers say
5.0 on Google from 43 reviews
On your quotes, this links to your Google profile so customers can read all your reviews.
- โ
โ
โ
โ
โ
Callum built us a deck that feels like a new room. The hidden fixings make the boards look amazing.
Grant W., Avoca Beach
- โ
โ
โ
โ
โ
Every board, screw and coat of oil was on the quote. He even sorted the engineering for us.
Jasmine K., Terrigal
- โ
โ
โ
โ
โ
Solid as a rock and finished right on time. The stairs are beautifully done.
Pete A., Erina
Common questions
Good to know
Do I need to be home while you work?
Not usually. As long as we can get to the work area, we'll text you when we arrive and when we're done.
What happens if it rains?
We keep an eye on the forecast and move the date if we need to. We'll always let you know as early as we can.
When do I pay?
A deposit to lock in your date, then the rest when the job's finished and you're happy with it. You can pay online in a couple of taps.
Are you licensed and insured?
Yes. Our licence and insurance details are on this quote, and we're happy to send copies.
Will you clean up after?
Always. We leave the site as tidy as we found it, or tidier.
Your own common questions and answers go here. We start you off with the usual ones and you change them to suit.
10-year structural guarantee
If the frame, stairs or handrails we build move or fail within ten years, we fix them free.
Good to know
Price includes engineering for the raised frame. Spotted gum varies in colour from board to board, which is part of its charm.
Terms and conditions
1. This quote is for the work listed. Anything extra is quoted and agreed with you before we do it. 2. Prices are fixed for the time shown on the quote. After that we may need to update the price. 3. A deposit, if shown, secures your booking and comes off the final invoice. 4. The rest is due by the date on the final invoice. We'll let you know if anything changes the price before we start. 5. Start dates can move with the weather. We'll keep you posted. 6. We're fully insured, and we leave the site clean and tidy. 7. If we find something we couldn't see when we quoted, we'll show you, explain the options and agree any change in writing before going ahead. 8. Our guarantee covers our workmanship. It doesn't cover damage from storms, accidents or other people's work.